Murum Hydropower Project(EPC),Malaysia
Investment Type : EPC
Location : It is located in Sarawak, Kalimantan (i.e. Borneo), Malaysia, with its dam site on Murum River, which is in the upper part of Rajang River Basin. The Project is the second cascade of the four-cascade development scheme of the upstream of Rajang River. It is about 70km away from the downstream Bakun Hydroelectric Project.
Installed Capacity : 944 MW

Malaysia is rich in hydropower resources, and it is one of the important overseas markets of CTGI. CTG entered Malaysian hydropower market in 2008, undertaking the construction of Murum HPP as an EPC contractor. The Project was completed and handed over in May 2015, with an installed capacity of 944 MW. Through the cooperation, CTG has built and maintained a good and long-term strategic cooperation relationship with local leading enterprises in energy resource development, i.e. Sarawak Energy Company (SEB).

In the future, CTGI aims to gradually expand its business scope to the investment in clean energy and power market in Malaysia.

Murum Hydropower Project(EPC)

Milestones:

Contract Award Ceremony on 11 August 2008

The Dam and Ecological Power Station were handed over to SEB on April 21, 2015

The Dam and Ecological Power Station were handed over to SEB on April 21, 2015

The Intake Tower was handed over to SEB on January 7, 2015.

The main powerhouse was handed over to SEB on May 25, 2015.

The Performance Certificate was issued by  SEB on July 27, 2016.